Lockyer Creek Railway Bridge (Lockyer)


Place Details
Place ID 600513
Registration Type State Heritage
Place Name Lockyer Creek Railway Bridge (Lockyer)
Place Classification Built
Place Category Transport - Rail
Place Type Bridge - railway
Themes 5 Moving goods, people and information / 5.3 Using rail
Register Entry Date 21/10/1992

Location
Address Toowoomba - Helidon Line
Town / Suburb LOCKYER CREEK
Post Code 4344
LGA LOCKYER VALLEY REGIONAL COUNCIL

Cultural Heritage Significance
Principal Period
of Significance
1900s (fabric)
Criterion A The Lockyer Creek railway bridge at Lockyer demonstrates the development of railways in Queensland, being an example of the way in which this important early railway line was upgraded to meet the requirements of the early 20th century. It illustrates the skill with which the technology of the era was used to solve the problems of climatic conditions and terrain encountered in this process.
Criterion E The design of the bridge is aesthetically pleasing as well as functional and its arches form an attractive contrast with the vegetation of its setting over a gully.
Criterion F This Lockyer Creek Railway Bridge at Lockyer was built to an innovative design, being only the second reinforced concrete arched bridge designed in Australia. It was one of a series of concrete arch bridges built for the Queensland railways between 1900 and 1913 and is unusual in construction for an Australian bridge, having separate twin parabolic arch ribs and braced concrete spandrel columns.
Criterion H The bridge is an important example of the work of William Pagan, Chief Engineer for Railways and a major figure in the early history of engineering in Queensland.

History
History This bridge was built in 1910 as part of the Brisbane - Toowoomba Railway and was one of three railway bridges constructed over Lockyer Creek. The railway opened for traffic between Helidon and Toowoomba on 1 May 1867. From the 1870s there has been a continuing process of improving the Main Line between Brisbane and Toowoomba because of its importance as a major arterial route. As part of that process, which required the replacement of original bridges to carry heavier loads, construction work began in 1908 on a new bridge and deviation over the Lockyer Creek tributary at 75m 48c. The design for the innovative reinforced concrete arch bridge was completed and signed by Chief Engineer, William Pagan on 2 February 1909. The bridge and deviation were completed and brought into use on 18 July 1910. The use of concrete arches for railway bridges is a distinctive feature in Queensland and South Australia. The first concrete bridge in Queensland was constructed at Petrie Terrace in 1897. Between 1900 and 1913, six arch concrete railway bridges were constructed in Queensland approximating with the term in office of William Pagan as Chief Engineer of Railways and it is believed that he was responsible for their design. The first two, at Rangeview, near Toowoomba and at Deep Creek, Chowey, followed the form of a stone arch bridge. Later bridges were more innovative in design and this bridge was the second reinforced concrete arch rail bridge in Australia, following the 1906 bridge built at Steep Rocky Creek near Gayndah. The Lockyer bridge has a single main span of 27.4 metres, about the same as the maximum span of Lockyer Creek, which was the third largest span of Australian arch bridges built at the time of construction.

Description
Description The Lockyer Creek Railway Bridge spans a dry gully on the eastern bank of Lockyer Creek, 1 kilometre south south east of Lockyer. It is a concrete arch bridge aligned on a 12 chain curve and carrying a single track on a ballasted deck. Its spans are: · 2x14 foot (4.3m) reinforced concrete arches, concrete abutment, common concrete piers. · 1x90 foot (27.4m) reinforced concrete arch supporting 2x13 foot (4.0m) and 2x10 foot (3.0m) reinforced concrete spandrel arches, common concrete piers. · 2x14 foot (4.3m) reinforced concrete arches, common concrete piers, concrete abutment. The spandrel columns are arranged in pairs, one for each arch rib, with crossbracing in concrete. The arch ribs are parabolic of rectangular section. There is a concrete balustrade. The whole structure is in cast-in-situ concrete.

Element
Element Name Lockyer Creek Railway Bridge (Lockyer)
Designer Name Pagan, William
Design Period 1900 - 1914 Early 20th century
Construction Period 1909 - 1910
Construction Method Arch - parabolic
Fabric (Exterior Structure) Concrete
Place Components Pier/s (bridge)
Abutments - railway bridge

Images and Maps
Images
Maps Create a Web Map



Information about places in the Queensland Heritage Register is maintained by the Department of Environment and Heritage Protection (EHP) under the Queensland Heritage Act 1992. Information available here is only part of the full Register entry and should not be taken as an official entry. Absence does not mean a particular place is not in the Register.

Certified copies of the full entries in the Register are available for a fee.

You can also search the full Register for a fee to find out if a place or parcel of land is listed or otherwise affected by the Act.

Last updated: 15 March 2013